Uniper Energy Storage GmbH (UST) offers fixed-price storage capacities at its Epe H-Gas facility for multiple storage years.
Uniper Energy Storage GmbH (UST) offers storage capacities in its Epe H-Gas storage facility for 2 or 3 storage years starting by 1st April 2028 at fixed prices. Please note, we are conducting two parallel auctions, each with a storage capacity of 2 TWh/year. However, the maximum total allocation for both auctions will be limited to 2 TWh/year, as the auctions are in competition with each other. Allocations can be made for a period of either 2 or 3 years, as UST will choose the most economical offer based predefined allocation rules.
Epe H-Gas Fast Churn
We are looking forward to your participation!
Epe H-Gas Fast Churn
- Offered capacity: 100 storage bundles are available, each with 20 GWh WGC (in total 2 TWh).
- Bundle structure:
Firm working gas capacity 18.700 GWh Firm withdrawal rate 24.200 MWh/h Firm injection rate 9.000 MWh/h Interruptible working gas capacity 1.300 GWh Interruptible withdrawal rate 6.500 MWh/h Interruptible injection rate 6.500 MWh/h - Flexibility: The structure enables a usage with an injection within 74 days and withdrawal within 34 days, resulting in a churn rate of 3.38.
- Technical Restrictions: Need to be considered. Please see Annex II of the Storage Contract.
- Storage connection: H-Gas market area Trading Hub Europe (THE).
- Duration: 2 or 3 storage years, starting 1st April 2028
- Fixed price: Gas storage capacities are offered at a fixed price.
- Timing: The auction runs on 29 September 2026, 11:00 - 12:00 in the Storage Portal of UST.
- Terms of participation: Bids can only be submitted via the UST Storage Portal. Please register as an "Advanced User" on time and complete the licensing form in the "My Account" section to participate in the auction.
- Additional information: All relevant information and contract documents are available in our published auction on the UST storage portal.
We are looking forward to your participation!


