7FieldsCEGH / THE
Mid churnUsage type
Fixed pricePricing type
Bundle structure
| Working Gas Capacity (WG) | Injection Rate (IR) | Withdrawal Rate (WR) | |
|---|---|---|---|
| Firm | 16.833 GWh | 10.000 MWh/h | 11.000 MWh/h |
| Interruptible | 0.000 GWh | 0.000 MWh/h | 0.000 MWh/h |
| Conditional | 0.000 GWh | 0.000 MWh/h | 0.000 MWh/h |
Storage curves
2.240
Churn rate
Injection curve
90.000 days
Withdrawal curve
73.000 days