Offered capacity and bundles
2000.000 GWh
100
31 Mar 2027 to 31 Mar 2029
Bundle Structure
| Working Gas Capacity (WG) | Injection Rate (IR) | Withdrawal Rate (WR) | |
|---|---|---|---|
| Firm | 18.700 GWh | 9.000 MWh/h | 24.200 MWh/h |
| Interruptible | 1.300 GWh | 6.500 MWh/h | 6.500 MWh/h |
| Conditional | 0.000 GWh | 0.000 MWh/h | 0.000 MWh/h |
Documents
Inventory financing service
pdf - 171.44 KB
Remit reporting service
pdf - 147.54 KB
GTCS 2026
pdf - 632.26 KB
Russia Sanctions Declaration
pdf - 125.22 KB
dummy_contract_-_Epe-H_Fast_Churn_Fixed_Price.pdf
pdf - 124.82 KB
Pricing and fees
Fixed price
Annual storage fees
A
€/MWh
Current year
Variable fee
0.8230
€/MWh
System service fee
16,198.000
€/year
Fee note
The fees above are for the 2026/2027 storage year. System service fee and variable injection fee are subject to annual recalculation in accordance with the price sheet (Annex IV GTCS) at the beginning of each storage year. The system service fee is not applicable if the storage customer already has a storage contract in place for the same facility during the term of this contract.
Important notes
Uniper Energy Storage offers working gas capacities via its Epe H-Gas Fast Churn Product at a fixed price.
The bidder has to bid in €/MWh for the variable A.
Please consider the reduced variable costs for the first churn of the product each storage year valid until 1 November of the respective storage year. See storage contract Articel 3 section 4 for more details.
By participating in this auction procedure, you submit a binding offer to conclude a Storage Contract based on the Epe H-Gas Fast Churn Product with Uniper Energy Storage GmbH.
By clicking the button ‘Submit a bid’ you declare that you fully accept the following documents:
- General Terms and Conditions for Storage Services of Uniper Energy Storage
- Storage Contract Epe H-Gas Fast Churn
- Russia Sanctions Declaration
Each bidder may submit any number of bids. If the bidder submits more than one bid, these apply as binding bids in relation to the storage capacity stated in the relevant bid, which can be accepted on a cumulative basis by Uniper Energy Storage.
All bidders undertake to treat all information they receive in the context of the auction procedure confidentially