Offered capacity and bundles
2000.000 GWh
100
31 Mar 2028 to 31 Mar 2031
Bundle Structure
| Working Gas Capacity (WG) | Injection Rate (IR) | Withdrawal Rate (WR) | |
|---|---|---|---|
| Firm | 18.700 GWh | 9.000 MWh/h | 24.200 MWh/h |
| Interruptible | 1.300 GWh | 6.500 MWh/h | 6.500 MWh/h |
| Conditional | 0.000 GWh | 0.000 MWh/h | 0.000 MWh/h |
Documents
Inventory financing service
pdf - 171.44 KB
Remit reporting service
pdf - 147.54 KB
Russia Sanctions Declaration
pdf - 125.22 KB
GTCS 2026
pdf - 632.26 KB
Pricing and fees
Fixed price
Annual storage fees
A
€/MWh/storage year
2026/2027
Variable fee
0.8230
€/MWh
System service fee
16,198.000
€/year
Fee note
The fees above are for the 2026/2027 storage year. System service fee and variable injection fee are subject to annual recalculation in accordance with the price sheet (Annex IV GTCS) at the beginning of each storage year. The system service fee is not applicable if the storage customer already has a storage contract in place for the same facility during the term of this contract.
Important notes
The Epe H-Gas Fast Churn product with fixed price, is offered with various contract durations. Therefore, we are simultaniously conducting one auction for a 2-years term and another for a 3-years term. However, the total allocation across both auctions will be limited at 2 TWh per year. Please note, all of your bids can be allocated if they match with Uniper Energy Storage' allocation rules.
The storage product Epe H-Gas Fast Churn will be offered as fixed price product.
The bidder has to bid in €/MWh per storage year for the variable A.
By participating in this auction procedure, you submit a binding offer to conclude a Storage Contract Epe H-Gas Fast Churn with fixed price with Uniper Energy Storage GmbH (“Uniper Energy Storage”).
By clicking the button ‘Submit a bid’ you declare that you fully accept the following documents:
- General Terms and Conditions for Storage Services of Uniper Energy Storage
- Storage Contract Epe H-Gas Fast Churn
- Russia Sanctions Declaration
Each bidder may submit any number of bids. If the bidder submits more than one bid, these apply as binding bids in relation to the storage capacity stated in the relevant bid, which can be accepted on a cumulative basis by Uniper Energy Storage.
All bidders undertake to treat all information they receive in the context of the auction procedure confidentially